LILY at Crosstown
- From $575,000
LILY at Crosstown
- From $575,000
Overview
- Aspen Ridge Homes
- 8
- 220
- Mid Rise
Address
Open on Google Maps- Address: 844 Don Mills Road
- City: Toronto
- Area: TORONTO NEIGHBOURHOODS
Description
LILY at Crosstown: A Serene Parkside Oasis in North York
Perched at Eglinton Avenue East and Don Mills Road in North York, LILY at Crosstown is a new pre-construction condo development by Aspen Ridge Homes. This 8-storey boutique-style mid-rise condominium will offer 220 modern suites, from 1-bedroom to 3-bedroom options that range in size from 459 to 1,070 sq. ft. The project is expected to launch in October 2023 and be completed in 2027.
Details
- Price From $575,000
- Property Type Condos
- Property Status Coming Soon
- Developers Aspen Ridge Homes
- Storeys 8
- Selling Status Selling Now
- Building Status TBD
- Int. Designer Sabrina Albanese
- Architect Core
- Building Type Mid Rise
- Suite Type Studio-3 Bedroom
- Occupancy 2026
- Deposit Structure Extended
- Total Suites 220
- Maintenance Fee $ 0.70/Sq Ft
- Parking $75000
- Parking Maintenance $ 80
- Locker Maintenance $39
- Ownership Condominium
- Assignment YES
Walkscore
SG Homes Mortgage Calculator
Monthly
- Down Payment
- Loan Amount
- Monthly Mortgage Payment
- Property Tax
- Home Insurance
- PMI
- Monthly HOA Fees
What's Nearby?
Powered by Yelp
ACCESS_LIMIT_REACHED: You've reached the access limit for this client. See instructions for requesting a higher access limit at https://docs.developer.yelp.com/docs/fusion-rate-limiting
Similar Listings
- From Low $500,000
Carbon Condos
38 Fieldway Rd Etobicoke, ON M8Z 3L2, Etobicoke, TorontoDevelopers: Altrerra
Deposit Structure: Extended
Occupancy: 2028
Building Status: Pre-Construction
- From High $500,000
Aspen At Pinnacle
65 Thomas Riley Rd, Etobicoke, ON, Canada, TorontoDevelopers: Pinnacle International
Deposit Structure: Extended
Building Status: TBD
- From Low $599,900
Q Tower Condos
200 Queens Quay West, Toronto, ON, Canada, TorontoDevelopers: Lifetime Development
Deposit Structure: Extended
Occupancy: 2029
Building Status: TBD